| Main Document (1.03 MB) |
|
|
| Figures |
| - Figures Section 1 (5.37 MB) |
| - Figure 2.1-1 Topographic Contours (1.12 MB) |
| - Figure 2.2-1 Floodplains (1 MB) |
| - Figures 2.3-1 and 2.3-2 (1.67 MB) |
| - Figures 2.4-1 and 2.4-2 (1.29 MB) |
| - Figure 2.5-1 - 2.5-3 (1.69 MB) |
| - Figures 2.9-1 and 2.9-2 (1.33 MB) |
| - Figures Section 3 (3.32 MB) |
| - Figure 6.1-1 Proposed and Operating Wind Farms/St. Lawrence Seaway Region (200 KB) |
|
|
| Appendices |
| - Appendix A - Blasting Plan (52 KB) |
| - Appendix B - Conceptual Design Report for Selected Infrastructure Improvements (16.4 MB) |
| - Appendix C - Offloading Facility Slip Basis of Design (11.9 MB) |
| - Appendix D - Draft Conceptual Approach to Drainage and Erosion and Sedimentation Control Measures (3.71 MB) |
| - Appendix E - Conceptual Spill Prevention, Control and Countermeasures Plan (4.29 MB) |
| - Appendix F - Preliminary Environmental Monitoring Plan (44 KB) |
| - Appendix G - Operations and Management Plan (140 KB) |
| - Appendix H - Agency Correspondence (5.84 MB) |
| - Appendix I - Phase 1A Cultural Resources Investigation and End of Field Letter (15.7 MB) |
| - Appendix J - Conceptual Wetlands Stream Mitigation Plan (6.66 MB) |
| - Appendix K - Bathymetry Report (1 MB) |
| - Appendix L - Wetlands and Waterways Delineation Report (10.7 MB) |
| - Appendix M - Invasive Species Control Plan (40 KB) |
| - Appendix N - Ecological Resources Report (12.3 MB) |
| - Appendix O - Bat Risk Assessment and Pre-Construction Monitoring (7.12 MB) |
| - Appendix P.1 - Avian Risk Assessment (716 KB) |
| - Appendix P.2 - Winter Bird Survey (522 KB) |
| - Appendix P.3 - Breeding Bird Survey (4.97 MB) |
| - Appendix P.4 - Spring Radar Survey (20.9 MB) |
| - Appendix P.5 - Fall Radar Study (24.5 MB) |
| - Appendix P.6 - Diurnal Bird Movement Study (461 KB) |
| - Appendix P.7 - Avian Acoustical Survey Report (502 KB) |
| - Appendix Q - Visual Resource Assessment and Line-of-Sight Drawings (27 MB) |
| - Appendix R - Obstruction Evaluation (306 KB) |
| - Appendix S - Conceptual Emergency Response Plan (47 KB) |
| - Appendix T - Microwave Path Analysis (1.27 MB) |
| - Appendix U - Decommissioning Plan (115 KB) |
| - Appendix V - Coastal Management Program - Federal Consistency Assessment Form (168 KB) |
| - Appendix W - Exhibit 4 - Environmental Impact of the Upstate NY Power Transmission Line, Article VII Application (2.65 MB) |